Home › Drivetrain › R150F (MANUAL TRANSMISSION / TRANSAXLE) › INPUT SHAFT
RM27T0E _52 Drivetrain _053702 R150F MANUAL TRANSMISSION / TRANSAXLE _0260832 INPUT SHAFT G

R150F MANUAL TRANSMISSION / TRANSAXLE  INPUT SHAFT  INSPECTION  


PROCEDURE

Hide 33368 1.INSPECT NO. 2 SYNCHRONIZER RING

a.
G037541

Apply gear oil to the cone of the input shaft, and check that the No. 2 synchronizer ring does not turn in either direction while pushing the No. 2 synchronizer ring.

If the No. 1 synchronizer ring turns, replace it.



b.
D026118

Push the No. 2 synchronizer ring against the cone of the input shaft. Measure the clearance between the No. 2 synchronizer ring and input shaft.

Standard clearance:

0.70 to 1.70 mm (0.0276 to 0.0669 in.)


If the clearance is not as specified, replace the synchronizer ring No. 2 with a new one.