Home › Drivetrain › DRIVE SHAFT / PROPELLER SHAFT › PROPELLER SHAFT ASSEMBLY
RM27T0E _52 Drivetrain _053704 DRIVE SHAFT / PROPELLER SHAFT _0260852 PROPELLER SHAFT ASSEMBLY A

DRIVE SHAFT / PROPELLER SHAFT  PROPELLER SHAFT ASSEMBLY  INSTALLATION  


PROCEDURE

Hide 1.INSTALL PROPELLER SHAFT ASSEMBLY

a.

Align the matchmarks on the propeller shaft flange and differential flange.


b.

Install the propeller shaft assembly with the 4 washer, 4 bolts and 4 nuts.

Torque:
88 N*m (899 kgf*cm, 65 ft.*lbf)


c.

Align the matchmarks on the propeller shaft flange and transfer flange.


d.

Install the propeller shaft assembly with the 4 washers and 4 nuts.

Torque:
88 N*m (899 kgf*cm, 65 ft.*lbf)