Home › Drivetrain › DRIVE SHAFT / PROPELLER SHAFT › PROPELLER SHAFT ASSEMBLY
RM27T0E _52 Drivetrain _053704 DRIVE SHAFT / PROPELLER SHAFT _0260852 PROPELLER SHAFT ASSEMBLY G

DRIVE SHAFT / PROPELLER SHAFT  PROPELLER SHAFT ASSEMBLY  INSPECTION  


PROCEDURE

Hide 37110 1.INSPECT PROPELLER SHAFT ASSEMBLY

a.
C061260

Using a dial indicator, check the propeller shaft runout.

Maximum runout:
Engine Maximum runout
1GR-FE, 1GD-FTV, 1KD-FTV, 5L-E 0.6 mm (0.0236 in.)
2TR-FE 0.8 mm (0.0314 in.)


If the shaft runout is more than the maximum, replace the propeller shaft.


Hide 2.INSPECT REAR PROPELLER SHAFT UNIVERSAL JOINT SPIDER BEARING

NOTICE:

Be careful not to grip the propeller shaft tube too tightly in a vise as this will cause deformation.


a.

Check the spider bearings for wear or damage.

If necessary, replace the spider bearing.


b.
C175289

Check the spider bearing axial play by turning the yoke while holding the shaft tightly.

Maximum bearing axial play:

0.05 mm (0.0019 in.)


If the axial play is more than the maximum, replace the spider bearing.