Home › Brake › BRAKE SYSTEM (OTHER) › VACUUM PUMP (for 1KD-FTV) › 2015.06–2020.08
RM27T0E _54 Brake _053713 BRAKE SYSTEM (OTHER) _0260934 VACUUM PUMP(for 1KD-FTV) A

BRAKE SYSTEM (OTHER)  VACUUM PUMP(for 1KD-FTV)  DISASSEMBLY  


PROCEDURE

Hide 29369 1.REMOVE CHECK VALVE SUB-ASSEMBLY

C111343

a.

Mount the pump in a vise.

NOTICE:

Place aluminum plates on the vise to prevent damage to the pump.



b.

Remove the union bolt, union and 2 gaskets.


c.
C111344

Remove the check valve and gasket.


Hide 2.REMOVE VACUUM PUMP END COVER

C111345

a.

Remove the 3 bolts.


b.
C111346

Using a 5 mm pin punch and hammer, tap out the 2 straight pins.


c.

Remove the end cover and 2 O-rings.


Hide 29303 3.REMOVE VACUUM PUMP ROTOR SUB-ASSEMBLY

C111347

a.

Remove the rotor together with the 5 blades.

NOTICE:

Be careful not to drop the blades.



Hide 29331 4.REMOVE VACUUM PUMP BLADE

a.

Remove the 5 blades from the rotor.


Hide 29351 5.REMOVE VACUUM PUMP GEAR

C111348

a.

Mount the gear in a vise.

NOTICE:

Place aluminum plates on the vise to prevent damage to the gear.



b.

Remove the gear lock nut.


c.

Remove the gear and woodruff key.


Hide 29336 6.REMOVE VACUUM PUMP SHAFT

C111349

a.

Using snap ring pliers, remove the snap ring.


b.
C111350

Using a plastic-faced hammer, tap out the shaft.


Hide 29300 7.REMOVE VACUUM PUMP BEARING

C111351

a.

Using a 17 mm socket wrench and press, press out the bearing.