The main power source is supplied to the air conditioning amplifier assembly when the ignition switch is turned to ON. The power source is used for operating the air conditioning amplifier assembly, servo motors, etc.
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
Start the engine before inspection. Check the relays, fuses and battery if the engine does not start.
Disconnect the G25 amplifier connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| G25-1 (IG+) - Body ground | Ignition switch off | Below 1 V |
| Ignition switch ON | 11 to 14 V |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G25-14 (GND) - Body ground | Always | Below 1 Ω |
| *a | Rear view of wire harness connector
(to Air Conditioning Amplifier Assembly) |
OK
NG