When installing the front hood moulding pad, heat the front hood moulding surface using a heat light.
| Item | Temperature |
|---|---|
| Hood Moulding | 20 to 30°C (68 to 86°F) |
Do not heat the front hood moulding excessively.
75777E
1.INSTALL FRONT HOOD MOULDING PAD
Clean the front hood moulding assembly surface.
Using a heat light, heat the front hood moulding assembly surface.
Remove the double-sided tape from the front hood moulding assembly surface.
Wipe off any tape adhesive residue with cleaner.
Install a new front hood moulding pad.
Remove the peeling paper from the face of a new front hood moulding pad.
After removing the peeling paper, keep the exposed adhesive free from foreign matter.
Install the front hood moulding pad.