Home › Power Source / Network › POWER DISTRIBUTION › INTEGRATION RELAY › from 2017.08
RM27T0E _57 Power Source / Network _053728 POWER DISTRIBUTION _0328752 INTEGRATION RELAY G

POWER DISTRIBUTION  INTEGRATION RELAY  ON-VEHICLE INSPECTION  


PROCEDURE

Hide 82641 1.INSPECT NO. 1 INTEGRATION RELAY (for 5L-E)

a.
E382205C02
0.354,0.5 0.771,0.75 0.417,0.25 2.292,0.5 2.708,0.75 0.417,0.25 2.406,0.542 2.719,0.74 0.313,0.198 10 false 1A 0.469,0.542 0.781,0.74 0.313,0.198 10 false 1C 0.125,0.094 0.438,0.292 0.313,0.198 10 false *a
*a Component with harness connected
(No. 1 Integration Relay)


Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1A-8 - 1C-1 Battery voltage is not applied to terminals 1C-1 and 1A-7 10 kΩ or higher
1A-8 - 1C-1 Battery voltage is applied to terminals 1C-1 and 1A-7 Below 1Ω


If the result is not as specified, replace the No. 1 integration relay.