ON-VEHICLE INSPECTION
Inspection · Vehicles built from Jan 2012
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| CHECK ILLUMINATION TIME OF GLOW INDICATOR LIGHT |
Check the light illumination duration.
Turn the ignition switch to ON and measure the light illumination time.
- Light illumination time:
- See graph.


Text in Illustration *A
w/ DPF
*B
w/o DPF
*1
Seconds
*2
Engine Coolant Temperature
°C (°F)
*3
Light Illumination Time
-
-
- If the result is not as specified, check the ECM, engine coolant temperature sensor, glow plug assembly and glow relay.
- HINT:
- Actual light illumination duration may vary slightly from the graph.
Turn the ignition switch off.
| CHECK PRE-HEATING |
Inspect the pre-heating time.
Turn the ignition switch to ON. Measure how long it takes for the battery voltage to be applied to the glow plugs.
- Standard Pre-Heating Time:
Engine Coolant Temperature
Specified Condition
40°C (104°F) or higher
1 second
Below 40°C (104°F)
See graph*
(Maximum: 21 seconds)
- HINT:
- *: The pre-heating time changes depending on the battery voltage.


Text in Illustration *1
Seconds
*2
Battery Voltage
(V)
*3
After Glow Time
-
-
- If the result is not as specified, check the ECM, engine coolant temperature sensor, glow plug assembly and glow relay.
Turn the ignition switch off.
| CHECK AFTER GLOW TIME |
Remove the No. 1 glow relay (GLOW 1) from the engine room relay block.

Remove the No. 2 glow relay (GLOW 2) from the engine room relay block.
After the engine starts, measure the time duration that battery voltage remains present.
- Standard After Glow Time:
Tester Connection
Condition
Specified Condition
2 - Body ground
After engine starts
Refer to graph below
2 - Body ground


If the result is not as specified, check the ECM, engine coolant temperature sensor, glow plug assembly and glow relay.Text in Illustration *A
w/ DPF
*B
w/o DPF
*1
Seconds
*2
Engine Coolant Temperature
°C (°F)
*3
After Glow Time
-
-
