2011-2013 Land Cruiser · Service Manual Brake

REASSEMBLY

Removal / installation · Vehicles built from Sep 2011


1. INSTALL BRAKE BOOSTER PISTON SUB-ASSEMBLY

  1. F051194
    Apply lithium soap base glycol grease to a new piston.

  1. Install the piston.

    NOTICE:
    When installing, be careful not to damage the seals, etc.

  1. Install the plug.

  1. Using 2 screwdrivers, install a new C-ring while pressing on the piston.

    HINT:
    Tape the screwdriver tip before use.


2. INSTALL MASTER CYLINDER BOOT

3. INSTALL MASTER CYLINDER PUSH ROD CLEVIS

  1. F051192E02
    Install the brake master cylinder side lock nut and rod operating adapter to the brake master cylinder.

    Torque:
    26 N*m{ 260 kgf*cm , 19 ft.*lbf }

  1. C177091
    Install the lock nut and master cylinder push rod clevis to the rod operating adapter.

    Torque:
    26 N*m{ 260 kgf*cm , 19 ft.*lbf }


4. INSTALL MASTER CYLINDER SOLENOID

  1. F051196
    Install a new gasket.

    NOTICE:
    Keep all surfaces of the master cylinder solenoid, master cylinder and gasket, especially contact surfaces, away from water and dust.

  1. F051195E02
    Install the master cylinder solenoid with 6 new bolts.

    Torque:
    32 N*m{ 325 kgf*cm , 24 ft.*lbf }


5. INSTALL BRAKE BOOSTER ACCUMULATOR PIPE

  1. C172891
    Install the brake booster accumulator pipe and compression spring.

    NOTICE:
    Ensure that no foreign matter enters the pump.

  1. Install a new O-ring to the brake booster accumulator.

  1. Install the brake booster accumulator.

    Torque:
    57 N*m{ 585 kgf*cm , 42 ft.*lbf }


6. INSTALL NO. 1 BRAKE BOOSTER PUMP BRACKET

  1. F051189E02
    Install the brake booster pump bush to the No. 1 brake booster pump bracket.

  1. Using a 5 mm hexagon wrench, install the No. 1 brake booster pump bracket with the 2 bolts.

    Torque:
    7.8 N*m{ 80 kgf*cm , 69 in.*lbf }


7. INSTALL BRAKE BOOSTER WITH ACCUMULATOR PUMP ASSEMBLY

  1. F051415E03
    Using a 4 mm hexagon wrench, install the 2 pins to the brake master cylinder.

    Torque:
    7.8 N*m{ 80 kgf*cm , 69 in.*lbf }

  1. Install 2 new brake booster pump collars and 2 brake booster pump bushes to the brake booster with accumulator pump assembly.

  1. C177150E01
    Install the brake booster with accumulator pump assembly to the brake master cylinder.

  1. F051199E01
    Install a new clip.

  1. F051186E03
    Connect the wire harnesses with the 2 screws.

    Torque:
    2.9 N*m{ 30 kgf*cm , 26 in.*lbf }

  1. F051185E01
    Install 2 new plugs.


8. INSTALL NO. 1 BRAKE ACTUATOR TUBE

  1. C172200E01
    Using a union nut wrench, install the No. 1 brake actuator tube.

    Torque:
    without union nut wrench:
    15 N*m{ 155 kgf*cm , 11 ft.*lbf }
    with union nut wrench:
    14 N*m{ 145 kgf*cm , 10 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 300 mm (11.8 in.).
    2. The torque value for use with a union nut wrench is effective when the union nut wrench is parallel to the torque wrench.


9. INSTALL NO. 1 BRAKE ACTUATOR HOSE

  1. C172887
    Using needle nose pliers, install the brake actuator hose with the 2 clips.


10. INSTALL MASTER CYLINDER RESERVOIR GROMMET

  1. F051416
    Apply lithium soap base glycol grease to 3 new reservoir grommets.

  1. Install the 3 reservoir grommets to the brake master cylinder.

    NOTICE:
    Be careful of the size of each grommet.


11. INSTALL BRAKE MASTER CYLINDER RESERVOIR SUB-ASSEMBLY

  1. C172198
    Install the brake master cylinder reservoir sub-assembly with the screw.

    Torque:
    1.7 N*m{ 17 kgf*cm , 15 in.*lbf }

  1. Install the master cylinder reservoir filler cap.

  1. C172197E01
    Using a pin punch and hammer, install a new pin to the brake master cylinder reservoir.


12. INSTALL NO. 1 BRAKE ACTUATOR BRACKET

  1. C172196
    Install the brake fluid level warning switch connector to the No. 1 brake actuator bracket.

  1. Using a 5 mm hexagon wrench, install the No. 1 brake actuator bracket with the bolt.

    Torque:
    7.8 N*m{ 80 kgf*cm , 69 in.*lbf }

← INSPECTION (from Sep 2011)INSTALLATION (Sep 2011 – Dec 2011) →