REMOVAL
Removal / installation · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1.
REMOVE FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
|
 |
Remove the 3 bolts and screw.
Turn the clip indicated by the arrow in the illustration to remove the fender splash shield.
| 2.
REMOVE FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
|
 |
- HINT:
- Use the same procedures described for the LH side.
| 3.
REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
|
 |
- Remove the 10 bolts and No. 1 engine under cover.
| 4.
REMOVE NO. 2 ENGINE UNDER COVER
|
 |
- Remove the 2 bolts and No. 2 engine under cover.
| 5.
REMOVE PROPELLER SHAFT HEAT INSULATOR |
 |
- Remove the 2 bolts and insulator.
| 6.
REMOVE FRONT PROPELLER SHAFT ASSEMBLY |
 |
for 1GR-FE, 2UZ-FE and Center Grease Fitting type:
- Place matchmarks on the propeller shaft flange and transfer flange.
Remove the 4 nuts and 4 washers.
- Place matchmarks on the propeller shaft flange and differential.
Remove the 4 nuts and 4 washers.
Remove the front propeller shaft.
for 1VD-FTV:
- Place matchmarks on the propeller shaft flange and transfer flange.
Remove the 4 nuts and 4 washers.
- Place matchmarks on the propeller shaft flange and differential.
Remove the 4 nuts and 4 washers.
Remove the front propeller shaft.