INSTALLATION
Removal / installation · Vehicles built from Sep 2011
| 1.
INSTALL REAR PROPELLER SHAFT |
 |
- Align the matchmarks on the propeller shaft flange and transfer.
Connect the propeller shaft with the 4 washers and 4 nuts.
-
Torque:
- 88 N*m{
900 kgf*cm
, 65 ft.*lbf
}
- Align the matchmarks on the propeller shaft flange and rear differential.
Install the propeller shaft with the 4 bolts, 4 washers and 4 nuts.
-
Torque:
- 88 N*m{
900 kgf*cm
, 65 ft.*lbf
}
| 2.
INSTALL TRANSFER HEAT INSULATOR |
 |
- Install the insulator with the 4 bolts.
-
Torque:
- 30 N*m{
306 kgf*cm
, 22 ft.*lbf
}