2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. INSTALL THROTTLE BODY ASSEMBLY

  1. A156182E02
    Align the protrusion of a new gasket with the groove of the intake manifold, and install the gasket.

  1. A158395
    Install the throttle body with the 3 bolts and nut.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. Connect the throttle position sensor and throttle control motor connector.

  1. A158396
    Connect the No. 1 water by-pass hose and No. 7 water by-pass hose to the throttle body.


2. INSTALL AIR CLEANER HOSE ASSEMBLY

  1. A175168E01
    Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.

  1. Tighten the 2 clamps.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the vacuum transmitting hose.

  1. Connect the No. 2 ventilation hose.


3. ADD ENGINE COOLANT
  1. Add engine coolant.

    Standard Capacity:
    Item
    Specified Condition
    w/o Transmission oil cooler
    w/o Rear Heater
    13.4 liters (14.2 US qts, 11.8 Imp. qts)
    w/ Rear Heater
    16.3 liters (17.2 US qts, 14.3 Imp. qts)
    w/ Transmission oil cooler
    w/o Rear Heater
    14.1 liters (14.9 US qts, 12.4 Imp. qts)
    w/ Rear Heater
    16.9 liters (17.9 US qts, 14.9 Imp. qts)

    HINT:
    TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).

  1. A168577
    Slowly pour coolant into the radiator reservoir until it reaches the F line.

  1. Install the radiator reservoir cap.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the coolant level. If the coolant level is low, add coolant.

  1. Install the radiator cap.

  1. Start the engine and warm it up until the thermostat opens.

    NOTICE:
    Switch off the A/C.

  1. Maintain the engine speed at 2000 to 2500 rpm.

    NOTICE:
    1. Make sure that the radiator reservoir still has some coolant in it.
    2. Pay attention to the needle of the water temperature meter. Make sure that the needle does not show an abnormally high temperature.
    3. If there is not enough coolant, the engine may burn out or overheat.
    4. Immediately after starting the engine, if the radiator reservoir does not have any coolant, perform the following: 1) stop the engine, 2) wait until the coolant has cooled down, and 3) add coolant until the coolant is filled to the F line.
    5. Run the engine at 2000 rpm until the coolant level has stabilized.

  1. Press the inlet and outlet radiator hoses several times by hand to bleed air.

    CAUTION:
    1. Wear protective gloves.
    2. Be careful as the radiator hoses are hot.
    3. Keep your hands away from the cooling fan.

  1. Stop the engine, and wait until the engine coolant cools down to the ambient temperature.

    CAUTION:
    Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A168578
    Check that the coolant level is between the F and L lines. If the coolant level is below the L line, repeat all of the procedures above. If the coolant level is above the F line, drain coolant so that the coolant level is between the F and L lines.


4. INSPECT FOR COOLANT LEAK

  1. A168576
    Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 123 kPa (1.3 kgf/cm2, 18 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and head.


5. CHECK THROTTLE BODY ASSEMBLY
  1. Check the throttle control motor operating sounds.

    1. Turn the engine switch on (IG).

    2. When depressing the accelerator pedal, check the operating sound of the running motor. Make sure that no friction noises are emitted from the motor. If friction noise exists, replace the throttle body.

  1. Check the throttle position sensor.

    1. Connect the intelligent tester to the DLC3.

    2. Turn the engine switch on (IG).

    3. Turn the intelligent tester on.

    4. Enter the following menus: Powertrain / Engine and ECT / Data List / All Data / Throttle Sensor Position.

    5. Depress the accelerator pedal. When the throttle valve is fully opened, check that the value of the "Throttle Sensor Position" is within the specification.

      Standard throttle valve opening percentage:
      60% or more

      HINT:
      When checking the standard throttle valve opening percentage, the shift lever should be in N.

      If the percentage is less than 60%, replace the throttle body.


6. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A178997
    Attach the 2 V-bank cover hooks to the bracket.

  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


7. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

  1. A178461
    Install the No. 1 engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


8. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

B180991
  1. Push in the clip indicated by the arrow in the illustration to install the fender splash shield.

  1. Install the 3 bolts and screw.


9. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

HINT:
Use the same procedures described for the LH side.

← INSPECTION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →