2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL VVT SENSOR (for Exhaust Side of Bank 2)
  1. Apply a light coat of engine oil to the O-ring of the VVT sensor.

    NOTICE:
    1. When reusing the VVT sensor, inspect the O-ring.
    2. If the O-ring has scratches or cuts, replace the VVT sensor.

  1. Install the VVT sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the VVT sensor connector.


2. INSTALL VVT SENSOR (for Intake Side of Bank 2)
  1. Apply a light coat of engine oil to the O-ring of the VVT sensor.

    NOTICE:
    1. When reusing the VVT sensor, inspect the O-ring.
    2. If the O-ring has scratches or cuts, replace the VVT sensor.

  1. Install the VVT sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the VVT sensor connector.


3. INSTALL VVT SENSOR (for Exhaust Side of Bank 1)
  1. Apply a light coat of engine oil to the O-ring of the VVT sensor.

    NOTICE:
    1. When reusing the VVT sensor, inspect the O-ring.
    2. If the O-ring has scratches or cuts, replace the VVT sensor.

  1. Install the VVT sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the VVT sensor connector.


4. INSTALL VVT SENSOR (for Intake Side of Bank 1)
  1. Apply a light coat of engine oil to the O-ring of the VVT sensor.

    NOTICE:
    1. When reusing the VVT sensor, inspect the O-ring.
    2. If the O-ring has scratches or cuts, replace the VVT sensor.

  1. Install the VVT sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the VVT sensor connector.


5. INSTALL NO. 1 AIR CLEANER HOSE

  1. A267635E01
    Install the No. 1 air cleaner hose with the 2 hose clamps.

    Torque:
    2.5 N*m{ 25 kgf*cm , 22 in.*lbf }

    Text in Illustration 
    *a
    Protrusion
    *b
    Groove
    *c
    Top
    *d
    Front

  1. Install the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the vacuum hose and No. 2 PCV hose.


6. INSTALL V-BANK COVER

  1. A271365E01
    Attach the 2 V-bank cover hooks to the bracket. Then align the 2 V-bank cover grommets with the 2 pins and press down on the V-bank cover to attach the pins.
    Text in Illustration 
    *1
    Pin
    *2
    Hook

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →