INSTALLATION
Removal / installation · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| 1. INSTALL GENERATOR ASSEMBLY |
Install the stud bolt.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 ft.*lbf }
Install the generator with the 3 bolts and nut.
- Torque:
- 43 N*m{ 438 kgf*cm , 32 ft.*lbf }
Connect the generator connector.
Connect the generator wire with the nut.
- Torque:
- 12 N*m{ 122 kgf*cm , 9 ft.*lbf }
Install the terminal cap.
Install the harness bracket to the generator with the bolt.
- Torque:
- 31 N*m{ 316 kgf*cm , 23 ft.*lbf }
| 2. CONNECT OIL COOLER PIPE ASSEMBLY |
Connect the oil cooler pipe with the 2 bolts.
- Torque:
- 14 N*m{ 143 kgf*cm , 10 ft.*lbf }
| 3. CONNECT VANE PUMP ASSEMBLY |
![]() ![]() |
- HINT:
- Before performing the following procedures, move the spacer until the vane pump can be installed.
Text in Illustration *1
Spacer
Connect the vane pump to the timing chain cover with the 2 bolts.
- Torque:
- 21 N*m{ 214 kgf*cm , 15 ft.*lbf }
| 4. INSTALL AIR CLEANER ASSEMBLY |
Install the air cleaner with the 3 bolts.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
| 5. INSTALL AIR CLEANER HOSE ASSEMBLY |
Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.

Text in Illustration *1
Groove
*2
Protrusion
Tighten the 2 clamps.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Connect the vacuum hose.
Connect the No. 2 ventilation hose.
| 6. INSTALL FRONT FENDER APRON SEAL FRONT RH |
Install the fender apron seal with the 3 clips.
| 7. INSTALL FAN AND GENERATOR V BELT |
Set the V belt onto every part.

While turning the belt tensioner counterclockwise, remove the bar.
Text in Illustration *1
Vane Pump
*2
Water Pump
*3
No. 1 Idler
*4
Fan
*5
Generator
*6
Belt Tensioner
*7
Crankshaft
*8
Cooler Compressor
- NOTICE:
- Make sure that the V belt is properly set to each pulley.
After installing the belt, check that it fits properly in the ribbed grooves.

Text in Illustration *a
CORRECT
*b
INCORRECT
- HINT:
- Make sure to check by hand that the belt has not slipped out of the grooves on the bottom of the pulley.
| 8. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY |
Install the No. 1 engine under cover with the 10 bolts.
- Torque:
- 29 N*m{ 296 kgf*cm , 21 ft.*lbf }
| 9. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH |
![]() ![]() |
Push in the clip indicated by the arrow in the illustration to install the fender splash shield.
Install the 3 bolts and screw.
| 10. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH |
- HINT:
- Use the same procedures described for the LH side.
| 11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable from the cable is reconnected (Click here).
| 12. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration *1
Bracket
*2
Hook
*3
Pin
*4
Grommet


