Removal / installation · Vehicles built Sep 2011 – Dec 2011
Versions by build date: Sep 2011 – Dec 2011from Jan 2012
1.
REMOVE V-BANK COVER SUB-ASSEMBLY
Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
Text in Illustration
*1
Bracket
*2
Hook
*3
Pin
*4
Grommet
2.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable from the cable is reconnected (Click here).
3.
REMOVE FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
Remove the 3 bolts and screw.
Turn the clip indicated by the arrow in the illustration to remove the fender splash shield.
4.
REMOVE FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
HINT:
Use the same procedures described for the LH side.
5.
REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
Remove the 10 bolts and No. 1 engine under cover.
6.
REMOVE FAN AND GENERATOR V BELT
While turning the belt tensioner counterclockwise, align the service hole for the belt tensioner and the belt tensioner fixing position, and then insert a bar of 5 mm (0.197 in.) into the service hole to fix the belt tensioner in place.
Text in Illustration
*1
Bar
HINT:
The pulley bolt for the belt tensioner has a left-hand thread.
Remove the V belt.
7.
REMOVE FRONT FENDER APRON SEAL FRONT RH
Using a clip remover, remove the 3 clips and fender apron seal.
8.
REMOVE AIR CLEANER HOSE ASSEMBLY
Disconnect the vacuum hose and No. 2 ventilation hose.
Loosen the 2 hose clamps.
Remove the air cleaner hose.
9.
REMOVE AIR CLEANER ASSEMBLY
Remove the 3 bolts and air cleaner.
10.
DISCONNECT VANE PUMP ASSEMBLY
Remove the 2 bolts and disconnect the vane pump.
11.
DISCONNECT OIL COOLER PIPE ASSEMBLY
Remove the 2 bolts and disconnect the oil cooler pipe.
12.
REMOVE GENERATOR ASSEMBLY
Disconnect the generator connector.
Remove the terminal cap and nut, and disconnect the generator wire.
Remove the bolt and wire harness bracket from the generator.