REMOVAL
Removal / installation · Vehicles built Sep 2011 – Dec 2011
| 1. REMOVE V-BANK COVER SUB-ASSEMBLY |
Remove the 2 nuts and V-bank cover.

| 2. REMOVE AIR CLEANER HOSE ASSEMBLY |
Disconnect the vacuum transmitting hose and No. 2 ventilation hose.

Loosen the 2 hose clamps.
Remove the air cleaner hose.
| 3. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY LH |
Disconnect the oil control valve connector and wire harness clamp.

Remove the bolt and camshaft timing oil control valve.
Remove the O-ring from the camshaft timing oil control valve.
| 4. REMOVE CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY RH |
Disconnect the oil control valve connector.

Remove the bolt and camshaft timing oil control valve.
Remove the O-ring from the camshaft timing oil control valve.
