2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. INSTALL SPARK PLUG
  1. Install the 8 spark plugs.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }


2. INSTALL IGNITION COIL ASSEMBLY

  1. A176582E01
    Install the 8 ignition coils with the 8 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 8 ignition coil connectors.


3. INSTALL AIR CLEANER ASSEMBLY

  1. A175167
    Install the air cleaner with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the clamp and MAF connector.


4. INSTALL AIR CLEANER HOSE ASSEMBLY

  1. A175168E01
    Install the air cleaner hose so that the protrusion of the air cleaner cap aligns with the groove of the hose as shown in the illustration.

  1. Tighten the 2 clamps.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the vacuum transmitting hose.

  1. Connect the No. 2 ventilation hose.


5. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A178997
    Attach the 2 V-bank cover hooks to the bracket.

  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← REMOVAL (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →