2011-2013 Land Cruiser · Service Manual General

TORQUE SPECIFICATIONS

Specifications · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012

AIR PUMP 
Part Tightened
N*m
kgf*cm
ft.*lbf
Air pump inlet x Air pump bracket
8.0
82
71 in.*lbf
Air pump assembly x Vehicle body
18
184
13
AIR SWITCHING VALVE (for Bank 1) 
Part Tightened
N*m
kgf*cm
ft.*lbf
Air switching valve x Cylinder head cover sub-assembly
21
214
15
Air tube x Air switching valve and Exhaust manifold sub-assembly RH
10
102
7
AIR SWITCHING VALVE (for Bank 2) 
Part Tightened
N*m
kgf*cm
ft.*lbf
Air switching valve x Cylinder head cover sub-assembly LH
21
214
15
Air tube x Air switching valve and Exhaust manifold sub-assembly LH
10
102
7
AIR INJECTION DRIVER 
Part Tightened
N*m
kgf*cm
ft.*lbf
Air injection control driver x Air Injection control bracket
2.0
20
18 in.*lbf
Air injection control driver assembly x Body
8.0
82
71 in.*lbf
Wire harness x Air Injection control bracket
5.0
51
44 in.*lbf
PURGE VALVE 
Part Tightened
N*m
kgf*cm
ft.*lbf
Purge VSV x Intake air surge tank
9.0
92
80 in.*lbf
PCV VALVE 
Part Tightened
N*m
kgf*cm
ft.*lbf
PCV valve sub-assembly x Cylinder head cover sub-assembly LH
27
275
20
← TORQUE SPECIFICATIONS (Sep 2011 – Dec 2011)SERVICE DATA (from Jan 2012) →