2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. INSTALL ENGINE SWITCH

  1. A176548
    Attach the 2 claws to install the switch.

  1. A175322
    Connect the switch connector.


2. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH

  1. B181910
    Connect the connectors and 2 clamps.

  1. Attach the 8 claws to install the panel pad.

  1. Install the screw.

  1. Install the clip.


3. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION

  1. E155134
    Attach the 7 claws to install the panel cushion.

← INSPECTION (Sep 2011 – Dec 2011)ON-VEHICLE INSPECTION (Sep 2011 – Dec 2011) →