2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. REMOVE NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION

  1. E155426E02
    Place protective tape as shown in the illustration.

  1. Using a moulding remover, detach the 7 claws and remove the panel cushion.


2. REMOVE LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH

  1. B181910
    Remove the clip.

  1. Remove the screw.

  1. Detach the 8 claws.

  1. Remove the panel pad and disconnect the connectors and 2 clamps.


3. REMOVE ENGINE SWITCH

  1. A175322
    Disconnect the switch connector.

  1. A175323
    Detach the 2 claws and remove the switch.

← COMPONENTS (Sep 2011 – Dec 2011)INSPECTION (Sep 2011 – Dec 2011) →