2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REPLACEMENT

Removal / installation · Vehicles built from Jan 2012


1. REPLACE INTAKE VALVE GUIDE BUSH
  1. Heat the cylinder head to approximately 80 to 100°C (176 to 212°F).

  1. Place the cylinder head on wooden blocks.

  1. A164331E03
    Using SST and a hammer, tap out the intake valve guide bush.
    SST
    09201-10000   (09201-01050)
    09950-70010   (09951-07100)

  1. Using a caliper gauge, measure the bush bore diameter of the cylinder head.

    Standard Bush Bore Diameter:
    Item
    Specified Condition
    STD
    10.285 to 10.306 mm (0.4049 to 0.4057 in.)
    O/S 0.05
    10.335 to 10.356 mm (0.4069 to 0.4077 in.)

  1. Select a new valve guide bush.

    New Guide Bush:
    Item
    Specified Condition
    Bush Bore Diameter
    10.285 to 10.306 mm (0.4049 to 0.4057 in.)
    10.335 to 10.356 mm (0.4069 to 0.4077 in.)
    Bush to be Used
    STD
    O/S 0.05

    If the bush bore diameter of the cylinder head is more than 10.306 mm (0.406 in.), machine the bush bore diameter to between 10.335 and 10.356 mm (0.4069 and 0.4077 in.).
    If the bush bore diameter of the cylinder head is more than 10.356 mm (0.408 in.), replace the cylinder head sub-assembly.

    New Guide Bush Diameter:
    Item
    Bush Diameter
    STD
    10.333 to 10.344 mm (0.4068 to 0.4072 in.)
    O/S 0.05
    10.383 to 10.394 mm (0.4088 to 0.4092 in.)

    HINT:
    Standard bush length: 41.3 to 41.7 mm (1.63 to 1.64 in.)

  1. A164332E03
    Using SST and a hammer, tap in a new intake valve guide bush to the standard protrusion height.
    SST
    09201-10000   (09201-01050)
    09950-70010   (09951-07100)

    Standard protrusion height:
    14.3 to 14.7 mm (0.563 to 0.579 in.)

    Text in Illustration 
    *1
    Protrusion Height

  1. A164333
    Using a sharp 5.5 mm reamer, ream the guide bush to obtain the standard oil clearance between the intake valve guide bush and intake valve stem.

    Standard oil clearance:
    0.025 to 0.060 mm (0.000984 to 0.00236 in.)


2. REPLACE EXHAUST VALVE GUIDE BUSH
  1. Heat the cylinder head to approximately 80 to 100°C (176 to 212°F).

  1. Place the cylinder head on wooden blocks.

  1. A164334E03
    Using SST and a hammer, tap out the exhaust valve guide bush.
    SST
    09201-10000   (09201-01050)
    09950-70010   (09951-07100)

  1. Using a caliper gauge, measure the bush bore diameter of the cylinder head.

    Standard Bush Bore Diameter:
    Item
    Specified Condition
    STD
    10.285 to 10.306 mm (0.4049 to 0.4057 in.)
    O/S 0.05
    10.335 to 10.356 mm (0.4069 to 0.4077 in.)

  1. Select a new exhaust valve guide bush.

    New Guide Bush:
    Item
    Specified Condition
    Bush Bore Diameter
    10.285 to 10.306 mm (0.4049 to 0.4057 in.)
    10.335 to 10.356 mm (0.4069 to 0.4077 in.)
    Bush to be Used
    STD
    O/S 0.05

    If the bush bore diameter of the cylinder head is more than 10.306 mm (0.406 in.), machine the bush bore diameter to between 10.335 and 10.356 mm (0.4069 and 0.4077 in.).
    If the bush bore diameter of the cylinder head is more than 10.356 mm (0.408 in.), replace the cylinder head sub-assembly.

    New Guide Bush Diameter:
    Item
    Bush Diameter
    STD
    10.333 to 10.344 mm (0.4068 to 0.4072 in.)
    O/S 0.05
    10.383 to 10.394 mm (0.4088 to 0.4092 in.)

    HINT:
    Standard bush length: 46.8 to 47.2 mm (1.84 to 1.86 in.)

  1. A164335E03
    Using SST and a hammer, tap in a new exhaust valve guide bush to the standard protrusion height.
    SST
    09201-10000   (09201-01050)
    09950-70010   (09951-07100)

    Standard protrusion height:
    14.3 to 14.7 mm (0.563 to 0.579 in.)

    Text in Illustration 
    *1
    Protrusion Height

  1. A164336
    Using a sharp 5.5 mm reamer, ream the exhaust valve guide bush to obtain the standard oil clearance between the exhaust valve guide bush and exhaust valve stem.

    Standard oil clearance:
    0.030 to 0.065 mm (0.00118 to 0.00256 in.)


3. REPLACE SPARK PLUG TUBE

HINT:
When using a new cylinder head, the spark plug tubes must be replaced.

  1. A053854E06
    Apply adhesive to the end of a new spark plug tube.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent.

    Standard seal diameter:
    15 mm (0.591 in.)

    Text in Illustration 
    *1
    Adhesive

    NOTICE:
    1. Install the spark plug tube within 3 minutes after applying adhesive.
    2. Be careful not to deform the spark plug tube.
    3. Be careful not to expose the seal to coolant for at least 1 hour after installing the spark plug tube.

  1. A164325E02
    Using a wooden block and hammer, tap in the spark plug tube to the specified protrusion height.

    Standard protrusion height:
    75.1 to 76.1 mm (2.96 to 3.00 in.)

    Text in Illustration 
    *1
    Cylinder Head Top Surface
    *2
    Protrusion Height

    NOTICE:
    To avoid tapping in the spark plug tube too far, measure the protrusion height while tapping in the tube.


4. REPLACE RING PIN

NOTICE:
It is not necessary to remove a ring pin unless it is being replaced.

  1. Remove the ring pins.

  1. Using a plastic-faced hammer, tap in new ring pins to the cylinder head.

    A214829E02

    Text in Illustration 
    *A
    for Bank 1
    *B
    for Bank 2
    *1
    Width
    *2
    Height
    *3
    Protrusion Height
    -
    -

    Standard Ring Pin:
    Item
    Height
    Width
    Protrusion
    Ring pin A
    11 mm (0.433 in.)
    11 mm (0.433 in.)
    5.5 to 6.5 mm (0.217 to 0.256 in.)
    Ring pin B
    10 mm (0.394 in.)
    11 mm (0.433 in.)
    3.5 to 6.5 mm (0.138 to 0.256 in.)

← INSPECTION (from Jan 2012)REASSEMBLY (from Jan 2012) →