2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL OIL PRESSURE SENDER GAUGE ASSEMBLY

  1. Apply adhesive to 2 or 3 threads of the oil pressure sender gauge.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent


    NOTICE:
    A178540E02
    Do not allow adhesive to contact the oil hole.

    Text in Illustration 
    *1
    Oil Hole

  1. Install the oil pressure sender gauge.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

    NOTICE:
    Do not start the engine within 1 hour after installation.

  1. Connect the sender gauge connector.


2. INSPECT ENGINE OIL LEVEL
  1. Warm up the engine, stop the engine and wait 5 minutes. The oil level should be between the dipstick low level mark and full level mark.
    If low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.


3. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the area that was worked on.


4. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the No. 1 engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


5. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH

B180991
  1. Push in the clip indicated by the arrow in the illustration to install the fender splash shield.

  1. Install the 3 bolts and screw.


6. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH

HINT:
Use the same procedures described for the LH side.

← REMOVAL (from Jan 2012)INSTALLATION (from Jan 2012) →