2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012


1. INSTALL KNOCK SENSOR

  1. A230378E01
    Install the 4 knock sensors with the 4 bolts so that the knock sensors are angled as shown in the illustration.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

    Text in Illustration 
    *A
    for Bank 2 Sensor 1
    *B
    for Bank 1 Sensor 1
    *C
    for Bank 2 Sensor 2
    *D
    for Bank 1 Sensor 2
    V100136
    Front
    V100137
    Upper Side
    V100138
    Rear

  1. Connect the 4 knock sensor connectors.


2. INSTALL NO. 1 ENGINE COVER

3. INSTALL NO. 2 ENGINE COVER

4. INSTALL SEPARATOR CASE
  1. Install the separator case with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


5. INSTALL NO. 3 ENGINE COVER

  1. A220035
    Install the No. 3 engine cover.
    Text in Illustration 
    V100135
    Engine Front

    HINT:
    Position the No. 3 engine cover so that the arrow mark faces the front of the engine and install it.


6. INSTALL NO. 4 ENGINE COVER

  1. A220036
    Install the No. 4 engine cover.
    Text in Illustration 
    V100135
    Engine Front

    HINT:
    Position the No. 4 engine cover so that the arrow mark faces the front of the engine and install it.


7. INSTALL NO. 1 EGR PIPE BRACKET
  1. Install the No. 1 EGR pipe bracket with the 3 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


8. INSTALL NO. 1 WATER OUTLET PIPE
  1. Install the No. 1 water outlet pipe with the 2 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


9. CONNECT NO. 11 WATER BY-PASS HOSE

  1. A239698E01
    Connect the No. 11 water by-pass hose.
    Text in Illustration 
    *1
    Paint Mark
    *a
    Upper Side

    HINT:
    The direction of the hose clamp is indicated in the illustration.


10. CONNECT NO. 8 WATER BY-PASS HOSE

  1. A239699E01
    Install the No. 8 water by-pass hose.
    Text in Illustration 
    *1
    Paint Mark
    *a
    Upper Side
    *b
    Front

    HINT:
    1. When connecting the hose, make sure the paint marks and clips are as shown in the illustration.
    2. The direction of each hose clamp is indicated in the illustration.


11. INSTALL NO. 2 WATER BY-PASS PIPE

  1. A239700E01
    Install the No. 2 water by-pass pipe with the 2 bolts and connect the hose.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    Text in Illustration 
    *1
    Paint Mark
    *a
    Upper Side

    HINT:
    1. When connecting the hose, make sure the paint marks and clips are as shown in the illustration.
    2. The direction of each hose clamp is indicated in the illustration.


12. INSTALL INTAKE MANIFOLD
(Click here)
← INSPECTION (from Jan 2012)COMPONENTS (from Jan 2012) →