2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built Sep 2011 – Dec 2011

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


2. REMOVE V-BANK COVER

  1. A178931
    Remove the 2 nuts and V-bank cover.


3. REMOVE PURGE VSV

A157597
  1. Disconnect the purge VSV connector.

  1. Disconnect the 2 purge line hoses.

  1. A157598
    Remove the bolt and purge VSV.

← COMPONENTS (from Jan 2012)REMOVAL (from Jan 2012) →