2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. REMOVE V-BANK COVER

  1. A267633E01
    Raise the front of the V-bank cover to detach the 2 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Pin
    *2
    Hook


2. REMOVE PCV VALVE SUB-ASSEMBLY
  1. Loosen the hose clamp and disconnect the PCV hose from the valve.

  1. A273470
    Remove the valve.

← REMOVAL (Sep 2011 – Dec 2011)INSPECTION (from Sep 2011) →