2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. INSTALL PURGE VSV

A153521
  1. Install the purge VSV with the bolt.

    Torque:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }

  1. Connect the 2 purge line hoses.

  1. Connect the purge VSV connector.


2. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A178997
    Attach the 2 V-bank cover hooks to the bracket.

  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← INSPECTION (Sep 2011 – Dec 2011)INSPECTION (Sep 2011 – Dec 2011) →