2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


2. REMOVE V-BANK COVER SUB-ASSEMBLY

  1. A178998
    Remove the 2 nuts and V-bank cover.


3. REMOVE PURGE VSV

A153521
  1. Disconnect the purge VSV connector.

  1. Disconnect the 2 purge line hoses.

  1. Remove the bolt and purge VSV.

← COMPONENTS (Sep 2011 – Dec 2011)INSPECTION (Sep 2011 – Dec 2011) →