2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. INSTALL VENTILATION VALVE SUB-ASSEMBLY

  1. A092803E03
    Apply adhesive to 2 or 3 threads of the ventilation valve.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

  1. A183923E01
    Install the ventilation valve to the cylinder head cover sub-assembly LH.

    Torque:
    27 N*m{ 275 kgf*cm , 20 ft.*lbf }

    HINT:
    After applying the specified torque, rotate the ventilation valve clockwise until the port facing in the direction indicated in the illustration.


2. INSTALL VENTILATION VALVE COVER
  1. Install the ventilation valve cover to the ventilation valve.


3. CONNECT VENTILATION HOSE
  1. Connect the ventilation hose to the ventilation valve.


4. INSTALL V-BANK COVER SUB-ASSEMBLY

  1. A178997
    Attach the 2 V-bank cover hooks to the bracket.

  1. Install the V-bank cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76 kgf*cm , 66 in.*lbf }

← INSPECTION (Sep 2011 – Dec 2011)PRECAUTION (from Sep 2011) →