2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built Sep 2011 – Dec 2011


1. REMOVE V-BANK COVER SUB-ASSEMBLY

  1. A178998
    Remove the 2 nuts and V-bank cover.


2. DISCONNECT VENTILATION HOSE
  1. Disconnect the ventilation hose from the ventilation valve.


3. REMOVE VENTILATION VALVE COVER
  1. Remove the ventilation valve cover from the ventilation valve.


4. REMOVE VENTILATION VALVE SUB-ASSEMBLY

  1. A113204
    Remove the ventilation valve from the cylinder head cover sub-assembly LH.

← COMPONENTS (Sep 2011 – Dec 2011)INSPECTION (Sep 2011 – Dec 2011) →