2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL ENGINE OIL PRESSURE SWITCH ASSEMBLY
  1. Apply adhesive to 2 or 3 threads of the oil pressure switch.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent

    NOTICE:
    Do not apply adhesive to the oil inlet port of the oil pressure switch.

  1. Install the oil pressure switch.

    Torque:
    15 N*m{ 153 kgf*cm , 11 ft.*lbf }

    NOTICE:
    Do not start the engine within 1 hour of installation.

  1. Connect the oil pressure switch connector.


2. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the area that was worked on.


3. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the No. 1 engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


4. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
  1. Push in the clip to install the front fender splash shield sub-assembly LH.

  1. Install the 3 bolts and screw.


5. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
  1. Push in the clip to install the front fender splash shield sub-assembly RH.

  1. Install the 3 bolts and 2 screws.

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →