INSPECTION
Inspection · Vehicles built from Jan 2012
Versions by build date: Sep 2011 – Dec 2011 from Jan 2012
| INSPECT COMMON RAIL ASSEMBLY RH |
Inspect the fuel pressure sensor.
Measure the resistance according to the value(s) in the table below.

- Standard Resistance:
Tester Connection
Condition
Specified Condition
1 - 2
25°C (77°F)
16.4 kΩ or less
2 - 3
25°C (77°F)
3 kΩ or less
If the result is not as specified, replace the common rail assembly RH.Text in Illustration *a
Component without harness connected
(Fuel Pressure Sensor)
| INSPECT COMMON RAIL ASSEMBLY LH (w/ DPF) |
Inspect the pressure discharge valve.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
1 - 2
20°C (68°F)
0.96 to 1.16 Ω
