INSTALLATION
Removal / installation · Vehicles built from Sep 2011
| 1. INSTALL CLUTCH START SWITCH ASSEMBLY |
![]() ![]() |
Install the clutch start switch with the nut.
- Torque:
- 16 N*m{ 160 kgf*cm , 12 ft.*lbf }
Connect the connector.
| 2. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (w/ Floor Under Cover) |
![]() ![]() |
Connect the connectors.
Attach the 3 claws to install the No. 1 instrument panel under cover.
Install the 2 screws.



