INSTALLATION
Removal / installation · Vehicles built from Sep 2011
- HINT:
- Use the same procedure for RHD and LHD vehicles.
- The procedure listed below is for LHD vehicles.
- Use the same procedure for RHD and LHD vehicles.
| 1. INSTALL NO. 1 CLEARANCE WARNING BUZZER |
![]() ![]() |
Attach the clip to install the No. 1 clearance warning buzzer.
Connect the connector.
| 2. INSTALL NO. 1 SWITCH HOLE BASE |
![]() ![]() |
Connect the connectors.
Attach the 4 claws to install the No. 1 switch hole base.
| 3. INSTALL NO. 1 LOWER INSTRUMENT PANEL FINISH PANEL |
Connect the connectors.
for Automatic Air Conditioning System:

Attach the 2 claws to install the room temperature sensor.
Attach the 2 claws to connect the 2 control cables.

w/ Driver Side Knee Airbag:
Attach the 16 claws to install the lower No. 1 instrument panel finish panel.
Install the 2 bolts.


w/o Driver Side Knee Airbag:
Attach the 9 claws to install the lower No. 1 instrument panel finish panel.
Install the 2 bolts.


Attach the 2 claws to close the hole cover.

| 4. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (w/ Floor Under Cover) |
![]() ![]() |
Connect the connectors.
Attach the 3 claws to install the No. 1 instrument panel under cover.
Install the 2 screws.
| 5. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH |
![]() ![]() |
Attach the 6 claws to install the No. 3 instrument cluster finish panel garnish.
| 6. INSTALL LOWER INSTRUMENT PANEL PAD SUB-ASSEMBLY LH |
Connect the connectors and 2 clamps.

Attach the 8 claws to install the panel pad.
Install the screw.
Install the clip.
| 7. INSTALL NO. 2 INSTRUMENT PANEL FINISH PANEL CUSHION |
Attach the 7 claws to install the panel cushion.

| 8. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH |
![]() ![]() |
Attach the 3 claws to install the No. 1 instrument cluster finish panel garnish.
| 9. INSTALL INSTRUMENT SIDE PANEL LH |
![]() ![]() |
Attach the 6 claws to install the instrument side panel.






