2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

INSTALLATION

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. INSTALL ENGINE OIL LEVEL SENSOR
  1. Install a new gasket to the engine oil level sensor.

  1. Install the sensor with the 4 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the connector.


2. ADD ENGINE OIL
  1. Add fresh oil.

    Standard Engine Oil:
    Oil Grade
    Oil Viscosity (SAE)
    API grade SL "energy-conserving", SM "energy-conserving", SN "resource-conserving" or ILSAC multigrade engine oil
    5W-30
    10W-30
    API grade SL, SM or SN multigrade engine oil
    15W-40
    20W-50


    Standard Engine Oil (for China):
    Oil Grade
    Oil Viscosity (SAE)
    API grade SL "energy-conserving", SM "energy-conserving", SN "resource-conserving" or ILSAC multigrade engine oil
    0W-20
    5W-20
    5W-30
    10W-30
    API grade SL, SM or SN multigrade engine oil
    15W-40
    20W-50


    Standard Oil Capacity:
    Item
    Specified Condition
    Drain and refill without oil filter change
    5.6 liters (5.9 US qts, 4.9 Imp. qts)
    Drain and refill with oil filter change
    6.1 liters (6.4 US qts, 5.4 Imp. qts)
    Dry fill
    7.1 liters (7.5 US qts, 6.2 Imp. qts)


3. INSPECT ENGINE OIL LEVEL
  1. Warm up the engine, and then stop the engine and wait for 5 minutes.

  1. Check that the engine oil level is between the low level and full level marks on the dipstick.
    If low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not fill engine oil above the full level mark.


4. INSPECT FOR OIL LEAK
  1. Start the engine. Make sure that there are no oil leaks from the area that was worked on.


5. INSTALL NO. 2 ENGINE UNDER COVER
  1. Install the No. 2 engine under cover with the 2 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


6. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
  1. Install the No. 1 engine under cover with the 10 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


7. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY RH
  1. Push in the clip to install the front fender splash shield sub-assembly RH.

  1. Install the 3 bolts and 2 screws.


8. INSTALL FRONT FENDER SPLASH SHIELD SUB-ASSEMBLY LH
  1. Push in the clip to install the front fender splash shield sub-assembly LH.

  1. Install the 3 bolts and screw.

← INSTALLATION (Sep 2011 – Dec 2011)COMPONENTS (Sep 2011 – Dec 2011) →