2011-2013 Land Cruiser · Service Manual
Engine / Hybrid / EV System
Home
›
Engine / Hybrid / EV System
› 1VD-FTV ENGINE CONTROL › VACUUM SWITCHING VALVE (for Engine Mounting)
INSTALLATION
Removal / installation
·
Vehicles built from Sep 2011
1. INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
Install the VSV with the bolt.
Torque:
6.0 N*m{ 61 kgf*cm , 53 in.*lbf }
Connect the 2 vacuum hoses and connector.
← INSPECTION (from Sep 2011)
COMPONENTS (from Sep 2011) →