INSTALLATION
Removal / installation · Vehicles built from Sep 2011
| 1. INSTALL NO. 2 QUARTER PANEL STEP SUB-ASSEMBLY RH (w/o Tire Carrier) |
![]() ![]() |
Install the quarter panel step and No. 2 quarter panel step ornament with the 2 bolts.
- Torque:
- 28 N*m{ 286 kgf*cm , 21 ft.*lbf }
| 2. INSTALL RACK LADDER SUB-ASSEMBLY |
![]() ![]() |
Install the rack ladder with the 6 bolts.
- Torque:
- 28 N*m{ 286 kgf*cm , 21 ft.*lbf }



