INSPECTION
Inspection · Vehicles built from Jan 2012
| INSPECT EXHAUST FUEL ADDITION INJECTOR ASSEMBLY |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
1 - 2
20°C (68°F)
7.1 to 7.9 Ω
- HINT:
- The temperature indicated under "Condition" is the temperature of the exhaust fuel addition injector assembly.
