INSTALLATION
Removal / installation · Vehicles built from Jan 2012
| 1. INSTALL AIR SWITCHING VALVE ASSEMBLY |
Install a new gasket and the air switching valve with the 3 bolts.

- Torque:
- 24 N*m{ 245 kgf*cm , 18 ft.*lbf }
Text in Illustration *1
Air Switching Valve
*2
Claw
*3
No. 3 Air Tube
- NOTICE:
- Make sure the claws of the gasket are not caught between the air switching valve and No. 3 air tube.
Install the 2 bolts.
- Torque:
- 10 N*m{ 102 kgf*cm , 7 ft.*lbf }
Attach the wire harness clamp and connect the air switching valve connector.
| 2. CONNECT NO. 1 AIR INJECTION SYSTEM HOSE |
Align the paint mark with the projection and connect the No. 1 air injection system hose.

Text in Illustration *1
Protrusion
*2
Paint Mark
- HINT:
- Make sure the direction of the hose clamp is as shown in the illustration.
| 3. CONNECT NO. 3 PCV HOSE |
Connect the No. 3 PCV hose.
| 4. INSTALL AIR CLEANER CAP AND HOSE |
Install the air cleaner cap and hose, and then tighten the hose clamp.
- Torque:
- 2.5 N*m{ 25 kgf*cm , 22 in.*lbf }
Attach the 4 clamps.
Connect the mass air flow meter connector and attach the clamp.
Connect the No. 2 PCV hose and No. 1 air hose.
| 5. INSTALL V-BANK COVER SUB-ASSEMBLY |
Attach the 2 V-bank cover hooks to the bracket. Then align the 3 V-bank cover grommets with the 3 pins, and press down on the V-bank cover to attach the pins.

Text in Illustration *1
Grommet
*2
Pin
*3
Hook
*4
Bracket
