2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REMOVAL

Removal / installation · Vehicles built from Jan 2012


1. REMOVE V-BANK COVER SUB-ASSEMBLY

  1. A274415E01
    Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
    Text in Illustration 
    *1
    Grommet
    *2
    Pin
    *3
    Hook
    *4
    Bracket


2. REMOVE AIR CLEANER CAP AND HOSE

  1. A272589
    Disconnect the No. 2 PCV hose and No. 1 air hose.

  1. Disconnect the mass air flow meter connector and detach the clamp.

  1. Detach the 4 clamps.

  1. Loosen the hose clamp and remove the air cleaner cap and hose.


3. DISCONNECT NO. 3 PCV HOSE

  1. A218501
    Disconnect the No. 3 PCV hose.


4. DISCONNECT NO. 1 AIR INJECTION SYSTEM HOSE

  1. A266188
    Disconnect the No. 1 air injection system hose.


5. REMOVE AIR SWITCHING VALVE ASSEMBLY

  1. A266189
    Detach the wire harness clamp and disconnect the air switching valve connector.

  1. A266190
    Remove the 2 bolts.

  1. A266191
    Remove the 3 bolts, air switching valve and gasket.

    NOTICE:
    Be careful not to damage the surfaces that contact the gasket.

← COMPONENTS (from Jan 2012)INSPECTION (from Jan 2012) →