REMOVAL
Removal / installation · Vehicles built from Jan 2012
| 1.
REMOVE V-BANK COVER SUB-ASSEMBLY
|
 |
- Raise the front of the V-bank cover to detach the 3 pins. Then remove the 2 V-bank cover hooks from the bracket, and remove the V-bank cover.
Text in Illustration
*1
|
Grommet
|
*2
|
Pin
|
*3
|
Hook
|
*4
|
Bracket
|
| 2.
REMOVE AIR CLEANER CAP AND HOSE
|
 |
- Disconnect the No. 2 PCV hose and No. 1 air hose.
Disconnect the mass air flow meter connector and detach the clamp.
Detach the 4 clamps.
Loosen the hose clamp and remove the air cleaner cap and hose.
| 3.
DISCONNECT NO. 3 PCV HOSE |
 |
- Disconnect the No. 3 PCV hose.
| 4.
DISCONNECT NO. 1 AIR INJECTION SYSTEM HOSE |
 |
- Disconnect the No. 1 air injection system hose.
| 5.
REMOVE AIR SWITCHING VALVE ASSEMBLY |
 |
- Detach the wire harness clamp and disconnect the air switching valve connector.
- Remove the 2 bolts.
- Remove the 3 bolts, air switching valve and gasket.
- NOTICE:
- Be careful not to damage the surfaces that contact the gasket.