Home › Power Source / Network › POWER DISTRIBUTION › POWER INTEGRATION SYSTEM
RM38G0E _57 Power Source / Network _100627 POWER DISTRIBUTION _0467511 POWER INTEGRATION SYSTEM L

POWER DISTRIBUTION  POWER INTEGRATION SYSTEM  PRECAUTION  


PRECAUTION FOR SEMICONDUCTOR POWER INTEGRATION ECU


a.

Do not remove or install the semiconductor power integration ECU and power distribution box assembly with the negative (-) battery terminal connected.

NOTICE:
·

After turning the ignition switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION

·

When disconnecting the cable from the negative (-) battery terminal while performing repairs, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE




b.

Make sure that the semiconductor power integration ECU and power distribution box assembly is not exposed to water, as it is not waterproof.


c.

Some load is connected to a dedicated circuit to prevent overcurrent. Therefore, parts other than those specified for the vehicle may not be able to be used.


d.

When replacing the semiconductor power integration ECU and power distribution box assembly, the system may not operate normally if the same part number is not used.


e.

Check that systems are operating normally before proceeding with troubleshooting.