Home › Engine / Hybrid System › 1GR-FE (EMISSION CONTROL) › AIR PUMP
RM38G0E _51 Engine / Hybrid System _101531 1GR-FE EMISSION CONTROL _0474408 AIR PUMP G

1GR-FE EMISSION CONTROL  AIR PUMP  ON-VEHICLE INSPECTION  


PROCEDURE

Hide 17610C 1.INSPECT AIR PUMP ASSEMBLY

a.

Start the engine and warm it up.


b.

Turn the ignition switch off.


c.
A488990

Connect the 400 A probe of an ammeter to the (+) wire of the air pump.


d.

Turn the ignition switch to ON.


e.

Measure the current while the air pump is turning.

HINT:

When Manual Mode is selected, the GTS initialization (atmospheric pressure measurement) is performed automatically. The initialization takes 5 seconds. After the initialization, air pump assembly and emission control valve operation can be selected.


Powertrain > Engine > Utility
Tester Display
Secondary Air Injection Check
50005 372 26
Standard Current:
GTS Operation Condition Specified Condition
AIR PUMP: ON, ASV 1: OPEN, ASV 2: OPEN 20°C (68°F) 10 to 40 A



f.

Turn the ignition switch to OFF.

NOTICE:
·

This Secondary Air Injection Check only allows technicians to operate the secondary air injection system for a maximum of 5 seconds.

Furthermore, the check can only be performed up to 4 times per trip. If the test is repeated, intervals of at least 30 seconds are required between checks.

While secondary air injection system operation using the GTS is prohibited, the GTS display indicates the prohibition (WAIT or ERROR).

If ERROR is displayed on the GTS during the test, stop the engine for 10 minutes, and then try again.

·

Performing the Secondary Air Injection Check repeatedly may cause damage to the secondary air injection system. If necessary, leave an interval of several minutes between System Check operations to prevent the system from overheating.

·

When performing the Secondary Air Injection Check operation after the battery cable has been reconnected, wait for 7 minutes with the ignition switch turned to ON or the engine running.

·

Turn the ignition switch off when the Secondary Air Injection Check operation finishes.