Home › Engine / Hybrid System › 1VD-FTV (EMISSION CONTROL) › EGR COOLER(w/o DPF)
RM25T0E _51 Engine / Hybrid System _029525 1VD-FTV EMISSION CONTROL _0133830 EGR COOLER A

1VD-FTV EMISSION CONTROL  EGR COOLER  REMOVAL  


PROCEDURE

Hide 1.REMOVE NO. 1 AND NO. 2 EGR VALVE ASSEMBLY

a.

Remove the No. 1 and No. 2 EGR valve assembly.

Click hereEngine / Hybrid System>1VD-FTV (EMISSION CONTROL)>EGR VALVE (w/o DPF)>REMOVAL


Hide 16279 2.REMOVE NO. 3 WATER BY-PASS PIPE

a.
A163653

Slide the 2 clamps and disconnect the 2 No. 12 water by-pass hoses from the EGR cooler assembly.


b.

Remove the bolt and No. 3 water by-pass pipe.


Hide 16296 3.REMOVE NO. 8 WATER BY-PASS HOSE

a.
A165501

Slide the 2 clamps and remove the 2 No. 8 water by-pass hoses from the EGR cooler assembly.


Hide 4.REMOVE STUD BOLT

a.
A165225

Using an E6 "TORX" socket wrench, remove the 4 stud bolts from the EGR cooler assembly.