Home › Engine / Hybrid System › 1GR-FE (ENGINE CONTROL) › ECM
RM25T0E _51 Engine / Hybrid System _029758 1GR-FE ENGINE CONTROL _0135332 ECM A

1GR-FE ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89664A 1.INSTALL GASKET

a.

Clean the ECM seal surface with non-residue solvent.


b.

Install a new gasket to the ECM.


Hide 89661 2.INSTALL ECM

a.

Install the ECM with the 4 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)

NOTICE:
·

Make sure the gasket is not folded or caught on any area of the surrounding part.

·

Make sure there is no foreign matter caught between the gasket and surrounding part.

·

Do not damage the gasket.




b.
A221117

Connect the 2 connectors and push each lock lever close to lock the ECM connectors.

NOTICE:
·

Be careful not to allow dirt, water, or other foreign matter to adhere to the connectors when connecting them.

·

Do not twist the wire harness when connecting the ECM connectors.

·

Make sure that the lock levers are opened 90° before connecting the ECM connectors. Failure to do this may cause the lock lever and terminals to break.

·

Make sure that the levers are securely locked.