26100G 1.INSTALL DIESEL THROTTLE BODY ASSEMBLY (for Bank 2)
Install a new gasket to the intake pipe.
Install the diesel throttle body assembly with the 2 bolts and 2 nuts.
Connect the 2 connectors to the diesel throttle body assembly.
26100G 2.INSTALL DIESEL THROTTLE BODY ASSEMBLY (for Bank 1)
Install a new gasket to the intake pipe.
Install the diesel throttle body assembly with the 2 bolts and 2 nuts.
Connect the 2 connectors to the diesel throttle body assembly.
17972 3.INSTALL NO. 2 COOL AIR INLET
| *a | Embossed Mark |
| *b | Front |
| *c | Paint Mark |
Insert the No. 2 cool air inlet to the diesel throttle body assembly.
Align the embossed mark of the diesel throttle body assembly within the paint mark of the No. 4 air hose.
| *a | 7 to 11 mm (0.276 to 0.433 in.) |
Tighten the hose clamp so that it is 7 to 11 mm (0.276 to 0.433 in.) from the end of the hose as shown in the illustration.
17971 4.INSTALL NO. 1 COOL AIR INLET
| *a | Embossed Mark |
| *b | Front |
| *c | Paint Mark |
Insert the No. 1 cool air inlet to the diesel throttle body assembly.
Align the embossed mark of the diesel throttle body assembly within the paint mark of the No. 4 air hose.
| *a | 7 to 11 mm (0.276 to 0.433 in.) |
Tighten the hose clamp so that it is 7 to 11 mm (0.276 to 0.433 in.) from the end of the hose as shown in the illustration.
17940D 5.INSTALL INTERCOOLER ASSEMBLY