1.INSTALL BEARING
Using a press, press in a new bearing to the shaft.
2.INSTALL VACUUM PUMP SHAFT
Using SST and a press, press in the shaft to the housing.
3.INSTALL HOLE SNAP RING
Using snap ring pliers, install a new snap ring.
Make sure that the snap ring is firmly installed to the groove.
4.INSTALL VACUUM PUMP GEAR
Install the woodruff key and gear to the pump with the lock nut.
5.INSTALL VACUUM PUMP ROTOR SUB-ASSEMBLY
Apply engine oil to the rotor and install it to the shaft.
6.INSTALL VACUUM PUMP BLADE
Install 5 new blades with the round end facing outward.
Apply engine oil to the blade.
Make sure that the blades are flush with the rotor surface.
7.INSTALL VACUUM PUMP END COVER
Install a new O-ring.
Install the end cover and temporarily install the 3 bolts.
Using a 5 mm pin punch and hammer, tap in the 2 straight pins.
Tighten the 3 bolts.
8.INSTALL CHECK VALVE SUB-ASSEMBLY
Install a new gasket and the check valve sub-assembly.
9.INSTALL VACUUM HOSE UNION
Install 2 new gaskets and the union with the union bolt.
Align and insert the union pin into the matching hole of the housing.