Home › Drivetrain › DRIVE SHAFT / PROPELLER SHAFT › FRONT PROPELLER SHAFT ASSEMBLY
RM25T0E _52 Drivetrain _029905 DRIVE SHAFT / PROPELLER SHAFT _0138401 FRONT PROPELLER SHAFT ASSEMBLY G

DRIVE SHAFT / PROPELLER SHAFT  FRONT PROPELLER SHAFT ASSEMBLY  INSPECTION  


CAUTION / NOTICE / HINT

NOTICE:
·

When using a vise, place aluminum plates between the part and vise.

·

When using a vise, do not overtighten it.



PROCEDURE

Hide 37110 1.INSPECT FRONT PROPELLER SHAFT ASSEMBLY

a.
C258371

Using a dial indicator, check the front propeller shaft assembly runout.

Maximum runout:

0.3 mm (0.0118 in.)


If the front propeller shaft assembly runout is more than the maximum, replace the front propeller shaft assembly.


Hide 2.INSPECT SPIDER BEARING

a.

Check the spider bearings for wear or damage.

If necessary, replace the spider bearing.


b.
C113731

Check the spider bearing axial play by turning the yoke while holding the front propeller shaft assembly tightly.

Maximum bearing axial play:

0.05 mm (0.00197 in.)


If the axial play is more than the maximum, replace the spider bearing.