A bolt without a torque specification is shown in the standard bolt chart.
Click hereGeneral>SPECIFICATIONS>STANDARD BOLT>SPECIFIED TORQUE FOR STANDARD BOLTS
65802A 1.INSTALL NO. 2 TOP BOW SUB-ASSEMBLY
Install No. 2 top bow sub-assembly with the 4 bolts.
65871 2.INSTALL TOP BOW HOLDER
Install the top bow holder with the bolt and nut.
Use the same procedure for all top bow holders.
65811B 3.INSTALL NO. 1 TOP BOW
Temporarily install the 3 No. 1 top bows to top bow holder.
Tighten the 6 bolts.
Use the same procedure for all bolts.
65837 4.INSTALL TOP BOW PLATE
Install the top bow plate with the 4 bolts and 4 nuts.
65910A 5.INSTALL TARPAULIN ASSEMBLY
Attach the 26 ropes to install the tarpaulin assembly.