44740 1.INSTALL VACUUM RESERVOIR ASSEMBLY
for LHD (1VD-FTV):
Install the vacuum reservoir assembly with the 2 bolts.
Connect the connector to the vacuum warning switch assembly.
for RHD (1HZ, 1VD-FTV), LHD (1HZ):
Install the vacuum reservoir assembly with the 2 bolts.
Connect the connector to the vacuum warning switch assembly.
44773F 2.CONNECT UNION TO CHECK VALVE HOSE
for LHD (1VD-FTV):
Connect the union to check valve hose and slide the clamp to secure it.
for RHD (1HZ, 1VD-FTV), LHD (1HZ):
Connect the union to check valve hose and slide the clamp to secure it.
44778 3.CONNECT CONNECTOR TO CHECK VALVE HOSE
for LHD (1VD-FTV):
Connect the connector to check valve hose and slide the clamp to secure it.
for RHD (1HZ, 1VD-FTV), LHD (1HZ):
Connect the connector to check valve hose and slide the clamp to secure it.