ТОПЛИВНЫЙ НАСОС ВЫСОКОГО ДАВЛЕНИЯ > ПОВТОРНАЯ СБОРКА |
| 1. INSTALL DELIVERY VALVE HOLDER |
![]() |
Install 4 new gaskets and the 4 valves to the distributive head.
Install the 4 springs to the 4 delivery valve holders.
Using SST, install the delivery holders.
| 2. INSTALL DISTRIBUTIVE HEAD PLUG |
![]() |
Install a new O-ring to the distributive head plug.
Using SST, install the head plug.
| 3. INSTALL TIMING CONTROL VALVE |
![]() |
Using a 5 mm hexagon wrench, install the timing control valve with the 2 bolts.
| *1 | 5 mm Hexagon Wrench |
| 4. INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE |
![]() |
Install a new washer and the hollow screw.
Install 2 new washers and the fuel pipe with the cap nut.
Install the wiring bracket with the bolt.
| 5. INSTALL NO. 4 NOZZLE LEAKAGE PIPE |
Install 2 new washers and the nozzle leakage pipe with the overflow screw.