CONSTRUCTION
System Main Relay (SMR) is, by the command of the EV control ECU, is the relay to make the power of the connection and disconnection of the high voltage circuit. SMRB (+), SMRG (-), is placed in SMRP (precharge) and No. 1 EV battery junction block assembly within the equipment case constructed from the register, we are a reliable actuation.
At the time of connection of the high voltage circuit, first turned ON SMRB and SMRP, followed by ON the SMRG, and OFF the SMRP. By passing a current through the beginning to register by this behavior, to protect the circuit from inrush current of high voltage. During the blockade, SMRG, is turned OFF the SMRB, EV control ECU will verify that you have surely cut off, respectively.
An interlock mechanism that detects when a high voltage part is exposed and automatically shuts off the SMR is provided at each connection point between service plug, FC converter assembly and inverter with converter assembly. When the interlock mechanism operates, a message is displayed in the multi-information display in the combination meter to warn the driver.